IAPMO Answers and Analysis

Answers and Analysis

This knowledge base, updated to include the analyses from the 2003 through the most recent editions of the Uniform Plumbing and Mechanical Codes, continues to be a premier source for engineers, inspectors, students, contractors and tradesmen. Questions come from a broad base of users, and answers are informal interpretations of the Codes provided by a committee of code officials and special experts - they are clearly stated and to the point. This updated site combines the most pertinent analyses from the previous manual and presents them together with those based on the most recent publications of the Uniform Codes. This makes the Answers and Analysis database one of the most valuable tools you as a member can access wherever you have an internet connection.

The Answers and Analysis tool makes it easy to search for relevant questions and answers, either based on keywords or specific sections/chapters of the code. To find questions related to specific topics, type in the keyword(s), select the code and the year and click "Search". To search for questions related to a specific section, type the section in the Section field and click "Search". To search a specific chapter or appendix, select either the UPC or UMC Table of Contents, and select the chapter/appendix from the list.

Click to search by UPC Table Of Contents    Click to search by UMC Table Of Contents
Match EXACT search terms
Match ALL search terms
Match ANY search terms
 
Questions matching UPC Chapter Appendix K
3 results
 
UPC 2003 Appendix K UPC 2006 Appendix K UPC 2009 Appendix K UPC 2012 Appendix H
Topic: Cleanouts for Effluent Lines
Are cleanouts required per Appendix K (or Section 719.0, 2003/2006/2009) for the effluent pipe from the septic tank to the leach line?
Appendix K does not require a cleanout downstream of a septic tank or downstream of a distribution box as it is presumed that a properly designed and adequately sized septic tank will discharge no solids or
materials that will create a stoppage.
 
UPC 2003 Appendix K UPC 2006 Appendix K UPC 2009 Appendix K UPC 2012 Appendix H
Topic: Sizing Dosing Fields
What is an appropriate application of sizing dosing systems?
Dosing systems are installed only when the total length of the leach field piping exceeds 500 feet. Dual systems are installed only when the leach field exceeds 1,000 lineal feet, and in each case the dosing liquid
volume must not exceed 75 percent of the interior area of the half of the system which is being dosed.
Dosing tanks are required by Section K 6.0 (H)(2003/2006/2009), H 6.0 (H) (2012) to be equipped with an automatic siphon or pump which discharges the tank once every 3 or 4 hours (6 or 8 hours in the case of dual systems).
 
UPC 2009 Appendix K UPC 2012 Appendix H UPC 2015 Appendix H
Topic: Private Sewage Disposal Systems
Where would I find the code on septic systems, setbacks and such?
Appendix H (2012/2015), Appendix K (2009) provides most if not all of the requirements of the installation of a septic system. However, these guidelines are for general purposes unless specifically adopted by the AHJ. The local AHJ for these types of systems should be contacted to obtain information regarding septic systems in that specific area.